Rock Creek Contracting

Kitchen remodeling

Cabinetry, stone, lighting, and the structure behind them, priced before demo.

Kitchen remodeling

Scope

Kitchen remodeling done with a written plan.

A kitchen is the most expensive room in a renovation per square foot. Cabinetry, stone, plumbing, lighting, and the structure behind it all need to show up on the line item before work starts.

Typical scope

  • Cabinetry
  • Counters
  • Backsplash
  • Islands and peninsulas
  • Ventilation
  • Plumbing rough-in
  • Electrical updates
  • Flooring

How it runs

The same operating rhythm on every scope.

  1. 01

    Walkthrough

    We listen, measure, photograph, and surface hidden costs early.

  2. 02

    Design and selections

    Materials, finishes, and fixtures land on a written selection sheet before pricing.

  3. 03

    Itemized estimate

    Line-by-line estimate with visible quantities, allowances, and trade scopes.

  4. 04

    Contract and schedule

    Signed scope, signed price, signed dates, and a milestone payment plan.

  5. 05

    Build with weekly updates

    Photos, schedule changes, blockers, and next steps arrive in writing each week.

  6. 06

    Final walk and punch list

    Close-out is documented in writing before final balance releases.

Start a kitchen remodeling conversation.

The walkthrough is free. The estimate is itemized. You owe nothing until you sign a contract.

Call (281) 217-7620